New terminal of Salé – Rabat Airport

Project Data

Country: Morocco
Area: Rabat Salé
Client:  ONDA ‐ Office National Des Aéroports
Timeframe: August 2017 – March 2019
Works Amount:  a.b. € 180 Milion Euro

Services

Technical studies:

  • Feasibility study
  • Detailed Design
  • Final design
  • Detailed specifications
  • Tender documents

 

Back to Projects Archive
46e86129be6dae77736a30c2f56e2ac7

The purpose of this contract is to carry out technical studies and works supervision of the new terminal at Rabat Salé Airport

The project involved the technical studies and the realization of :

  • Building (25m x 25m frames according to plans architect, welded reinforced concrete floor and superstructure in metal structure)
  • Landscaping
  • Various networks (electric power supply, wastewater treatment)