A1 Sasso Marconi – La Quercia: widening

Design and Technical Assistance for the supervision of the construction works of the first 20 km of the historic by-pass of A1 highway.

Project Data

Country: Italy
Location within country: Tuscany
Name of Client: Autostrade per l’Italia S.p.A

Services
  • Feasibility, preliminary and Final Design
  • Works Supervision
  • Contract management
  • Financial management
  • Environmental Impact Study
  • Environmental monitoring during construction phase
  • Safety coordination during construction phase
Back to Projects Archive
viad reno 03

Project Introduction
Design and Technical Assistance for the supervision of the construction works of the first 20 km of the historic by-pass of A1 highway. The construction works are divided into 4 lots.

  • Lot 1: widening of the existent infrastructure (as for the first 6 km) and by-pass of the remaining highways section  (crossing of Rhine river).
  • Lot 2: 4,7 km long. Widening of the existing infrastructure (as for 3 km) and by-pass of the remaining highway section (crossing of Mount Mario). Both lot 1 and 2 are part of Sasso Marconi municipality.
  • The interventions foreseen by the detailed project of Lot 3 fall upon Sasso Marconi, Monzuno and Marzabotto municipalities and concern the strengthening of the highway in the first section (about 360 m) and the construction of about 4 km of road, underground and on viaduct.
  • Lot 4: highway strengthening is characterised by the construction of Campolungo Viaduct (about 290 m), which allow to cross the Bologna – Firenze railway, and by the Campolungo tunnel (about 230 m).