Preliminary and Detailed Design of Bus Rapid Transport (BRT) public transport line in Abidjan

Project Data

Country: Ivory Coast

Location within country: –

Name of Client: Ministry of Transport

Time frame: 4.2019 – ongoing

Works amount: N.a.

Services
  • Design of the service offer of public transport on site (TCSP);
  • Definition and development concepts of the infrastructure of the TCSP;
  • Preliminary analysis of the impact of the project on residual road traffic and its environment;
  • Socio-economic study.
Back to Projects Archive
IMG_5157

The main objective of the project is to develop the Preliminary and Final Design of the East-West Bus Rapid Transit (BRT) line between Yopoungon and Bingerville in Abidjian (Côte d’Ivoire).

The BRT route, approximately 20 km long, will be fully segregated in the median of the roadway, to guarantee the commercial speed. Stations will be closed with off-board fare collection system and will be at-level with bus platforms, to enable faster boarding and aligning. The project will include tunnels (approx. 1km) and viaducts (approx. 3 km).